🍁 100% CANADIAN OWNED AND OPERATED

Visit us in REGINA and SASKATOON

STORE HOURS: Mon-Fri 8-4:30

Frequently asked about Assisted DIY deck building in Saskatchewan

Assisted DIY is a hybrid TUDS service where The Ultimate Deck Shop builds the structural portion of a deck, patio, or fence (piles and code-compliant frame; excavation and base prep; augured post holes and set posts) and the homeowner finishes the project (deck boards, railing, lighting; pavers; fence panels and caps). Customers save approximately two-thirds on install cost because finishing labour represents roughly two-thirds of a typical install bill, while structural work represents roughly one-third. The structural work TUDS keeps is the code-critical, foundation-defining portion — the part where mistakes show in year five.

Available in Saskatoon, Regina, Moose Jaw, Prince Albert, Yorkton, Lumsden, Warman, Martensville, Swift Current, North Battleford, Weyburn, Estevan, Humboldt, Melville, Rosthern, Tisdale, plus Calgary, Edmonton, and Winnipeg via material delivery. Includes permit-grade CAD drawings, full materials takeoff, permit help (TUDS pulls or guides), materials delivery, structural workmanship, and direct phone support throughout the customer's finishing weekends. Compared with hiring a separate designer and buying materials from a big-box store, TUDS Assisted DIY combines designer, materials supplier, and structural builder in one accountable relationship.

Common search terms for this page: DIY deck design service Saskatchewan; deck framing service Saskatoon; deck framing Regina; assisted DIY deck Canada; save on deck install Saskatchewan; code-compliant deck framing Saskatoon; patio base prep Saskatoon; fence post installation Saskatchewan; deck framing contractor Saskatoon; deck framing contractor Regina; how do I save on a deck install in Saskatchewan; can I install my own composite deck boards; what does TUDS Assisted DIY include; how much does Assisted DIY cost; what does TUDS do versus what do I do on Assisted DIY; what part of a deck install is most expensive; what is structural deck framing; do I need a permit for a deck in Saskatoon; do I need a permit for a deck in Regina; can I build my own deck and keep the warranty; deck builder vs DIY Saskatchewan; alternative to hiring a deck builder Saskatchewan; Saskatoon Deck Shop alternative; Rusty Shovel alternative for decks Regina; SiteOne alternative Saskatoon; deck building help Prairie; deck plans Saskatchewan; deck plans Regina; deck plans Saskatoon; ultimate deck shop Saskatoon assisted DIY; ultimate deck shop Regina assisted DIY; saskatoon-deck-shop alternative; theultimatedeckshop assisted diy; tuds assisted diy.

TUDS Assisted DIY · Saskatchewan + Alberta + Manitoba

We build the structure. You finish it.

First weekend of May. Coffee on the deck, not inside. That's what we're helping you get to. TUDS handles the structural work — piles and a code-compliant frame on a deck, excavation and base on a patio, augur and post-set on a fence. Then we hand it to you. You bring the deck boards, the railing, the lighting — the parts you'll actually touch every day. Save about two-thirds on install. Keep a foundation that passes inspection.

How Assisted DIY actually works

Eight steps — quote, plan, structure by TUDS, finishing by you.

The full Assisted DIY workflow. TUDS handles steps that determine whether your build passes inspection and survives Prairie freeze-thaw. You handle the steps where DIY savings live — the boards, the railing, the lighting, the pavers, the panels.

  1. 1

    Quote

    You walk in or call. An Escape Artist captures dimensions, scope, and budget — and prices both halves: the structural work TUDS will do (piles + frame, excavation + base, or post-set) AND the materials list for the finishing work you'll handle. One number, two line-items.

    Who: TUDSTiming: 30 min in-store
  2. 2

    Drawings + materials takeoff

    TUDS produces a permit-grade CAD plan for the structure (footing layout, joist plan, post locations) and a to-the-board materials takeoff for the finishing work — every deck board, fastener, post cap, paver, panel, screw. The plan walks the inspector through without questions.

    Who: TUDSTiming: 1–2 weeks
  3. 3

    Permit help

    If you'd rather we pull the permit, TUDS pulls it for a small flat fee. If you'd rather pull it yourself, we hand you a permit pack — drawings, spec sheets, and a checklist tailored to your municipality (Saskatoon, Regina, Moose Jaw, Warman, etc.). Your call.

    Who: TUDS or YouTiming: 1–3 weeks (city-dependent)
  4. 4

    Materials delivery

    TUDS coordinates delivery of the structural materials AND the finishing materials to your job site, scheduled to land before our framing crew arrives. One delivery window. No four trips to the store mid-build.

    Who: TUDSTiming: 1–2 weeks lead-time
  5. 5

    Structural work — by TUDS

    This is where TUDS earns its keep. Decks: piles drilled and set, frame built code-compliant — joist spacing, blocking, ledger, post-to-beam connections all to spec. Patios: excavation, base prep, compacted gravel and screeded sand. Fences: post holes augured and posts set plumb in concrete. Inspection-ready when we leave.

    Who: TUDSTiming: 2–5 days on-site
  6. 6

    Hand-off to customer

    TUDS hands you a code-compliant structure ready for finishing. Inspection (if scheduled) signs off the structural portion. The materials for your finishing work are stacked and tarped on site. We walk you through the plan, the fastener spec, and the order of operations on the boards/pavers/panels.

    Who: BothTiming: 30 min walk-through
  7. 7

    Finishing — by you

    Your weekend, your hammer. Decks: deck boards screwed down, railing set, lighting wired, accessories trimmed. Patios: pavers laid, edge restraints in, polymeric sand swept and tamped. Fences: panels hung, caps set, gates aligned. The plan tells you exactly what goes where. The savings live here — this is where DIY money is made.

    Who: CustomerTiming: 2–6 weekends
  8. 8

    TUDS on call throughout

    Saturday at 2pm, you're staring at a board that doesn't sit flat or a post cap that won't seat. You call. An Escape Artist picks up — Shane, Wade, or whoever's on the floor that day. Phone, walk-in, or text. Five-minute call beats a returned-on-Monday email. This is the part of Assisted DIY customers tell us surprised them most.

    Who: TUDSTiming: Through your build
Three ways to get the project done

Pick the path that fits your weekend.

Managed Install for hands-off (lifetime workmanship warranty held by TUDS). Assisted DIY for the handy homeowner who wants a pro-built structure and ~2/3 install savings on the finishing. DIY help for the contractor or experienced builder. Most of our handy customers go Assisted DIY once they understand the structural-vs-finish split.

Completed Eva-Last Pioneer composite deck on a Saskatchewan covered patio — built end-to-end by TUDS Managed Install
Turn-key Tier
Full white-glove

Managed Install

TUDS owns the entire project — quote to final inspection. Lifetime workmanship warranty stays with us. For homeowners who want a deck without managing a build.

Managed Install is the premium tier — TUDS handles every step from quote through final inspection. We pull permits, schedule contractors, coordinate materials, visit the site during the build, run final walk-through, and the lifetime workmanship warranty stays with TUDS. If your contractor moves on, retires, or leaves the trade, your warranty backstop is still here.

Most coordinated path. Highest total cost. Lowest time investment from you. Read the full Managed Install breakdown.

Who does the structural work
TUDS — vetted contractor
Who does the finishing work
TUDS — same contractor
Who pulls permits
TUDS
Workmanship warranty
Lifetime — held by TUDS
Material warranty
Vendor — TUDS helps navigate
Time you invest
Sign-off + walk-through only
SHANE
SHANE · Co-owner, TUDS

“Managed Install is for the customer who tells us 'I want a deck, not a project.' We own the build, we hold the workmanship warranty, and you have one phone number to call if anything goes sideways — even ten years from now.”

Brazilian Teak Apex PLUS composite deck on a Prairie backyard — TUDS built the piles and frame, the homeowner installed the boards, railing, and lighting
Most popular Tier
We build the structure

Assisted DIY

We build the structure. You finish it. Save about two-thirds on install. Code-compliant foundation by us — finishing work by you.

Assisted DIY is for the handy homeowner who wants the savings of a DIY build without inheriting a structural problem. The framing on a deck — piles, beams, joists, ledger — is the part where mistakes don't show until year five and then they show big. The base on a patio is what determines whether your pavers heave. The post-set on a fence is what keeps it standing in a Prairie wind. That's the work TUDS does.

Then we hand it to you. You install the deck boards, hang the railing, wire the lighting. Or you lay the pavers. Or you hang the fence panels and set the caps. The CAD plan and material takeoff tell you exactly what goes where. Every Assisted DIY package includes the structural work, permit-grade drawings, full takeoff, materials delivered, and direct phone support through your build.

You save about two-thirds of install cost because finishing labour — boards, railing, pavers, panels — is roughly two-thirds of a typical install bill. The structural work TUDS keeps is the load-bearing third. Same shape across decks, patios, and fences.

Who does the structural work
TUDS — piles, frame, base, posts
Who does the finishing work
You — boards, railing, pavers, panels
Permit help
TUDS pulls or guides — your call
Material delivery
TUDS — coordinated to job site
Build-week support
Phone + walk-in throughout
Install savings
~2/3 of total install cost
WADE
WADE · Co-owner, TUDS

“If you've hung drywall or framed a fence, you can install deck boards. The hard part isn't the screwing-down — it's the framing underneath. That's structural, that's where the inspector looks twice, and that's where mistakes cost you in year five. We do that part. You do the part you'll touch every weekend. Most handy customers go this route once they understand it.”

Eva-Last Infinity IS deck installed by a Saskatoon homeowner using TUDS-supplied drawings, materials list, and walk-in expertise — no TUDS labour
Self-serve Tier
Lowest cost

DIY help

You build all of it — piles, frame, finish. TUDS gives you free drawings, material takeoff, permit guidance, and answers the phone when you're stuck.

DIY help is for the experienced builder, the contractor working on their own home, or the homeowner who genuinely wants to swing every hammer themselves. TUDS doesn't touch a shovel — but we do everything ahead of and alongside the build that we can. Free drawings for basic decks (we have a tool that generates them), free material takeoff, free permit guidance, free product advice, free phone-and-walk-in support through your build.

Lowest total cost — you keep all the labour savings. The right answer if you've built a deck before, or you're a tradesperson sourcing for your own house. Read the full DIY help breakdown.

Drawings
Free for basic decks
Material takeoff
Free — full list
Permit guidance
Free advisory · paid if we pull
Material delivery
Optional — pickup or delivery
Phone + walk-in support
Free — through your build
Install savings
100% — you keep all labour savings
SHANE
SHANE · Co-owner, TUDS

“There's no better place than TUDS for someone tackling it themselves. We're more knowledgeable, more willing to help, and more willing to figure things out and answer questions than any lumberyard or box store. We don't touch the build, but we set you up to win.”

2-minute quiz

Should you go Managed Install, Assisted DIY, or DIY help?

Five questions. One honest recommendation. No email required. Be honest with yourself on the structural-comfort question — it's where most customers self-select into Assisted DIY.

Question 1 of 5
0% complete

How handy are you?

Past Assisted DIY projects

Decks our customers finished themselves, across the prairies.

Filter by service tier. The bulk of these are Assisted DIY — TUDS-built piles and frame, customer-installed boards, railing, and lighting. Same boards, same finish, their own labour on the part where DIY savings actually live.

wade pick
Apex PLUS deck · 320 sq ft · Saskatoon · TUDS frame, customer finish
Assisted DIY · Finished
shane pick
Infinity IS deck · 280 sq ft · Regina · framed by TUDS, boards by family
Assisted DIY · Finished
Pioneer entry deck · 180 sq ft · Lumsden · TUDS piles + frame, finished by homeowner
Assisted DIY · Finished
Apex PLUS deck · 240 sq ft · Warman · TUDS frame handed off · in-progress
Assisted DIY · During
wade pick
Infinity IS deck · 360 sq ft · Saskatoon · finished by handy homeowner
Assisted DIY · Finished
Apex PLUS deck · 220 sq ft · Moose Jaw · couple-built finishing
Assisted DIY · Finished
Pioneer multi-level deck · 480 sq ft · Martensville · TUDS frame, owner-finished
Assisted DIY · Finished
shane pick
Apex PLUS first deck · 200 sq ft · Yorkton · TUDS structural, homeowner finish
Assisted DIY · Finished
Infinity IS small platform · 140 sq ft · Prince Albert
Assisted DIY · Finished
Pioneer poolside · 380 sq ft · Saskatoon · TUDS frame, owner-finished
Assisted DIY · Finished
wade pick
Apex PLUS dad-and-son build · 260 sq ft · Regina · TUDS frame day-1, finishing across summer
Assisted DIY · Finished
Pioneer covered deck · 420 sq ft · Regina · Managed Install (full white-glove)
Managed Install · Finished
shane pick
Pioneer poolside · 540 sq ft · Saskatoon · Managed Install
Managed Install · Finished
Apex PLUS contractor's-own · 320 sq ft · Yorkton · DIY help only
DIY help · Finished
Infinity IS second-deck · 240 sq ft · Saskatoon · DIY help only
DIY help · Finished
15 representative projects — Assisted DIY (12), Managed Install (2), DIY help (1)
If you walked into TUDS

The three questions handy homeowners ask at the planning desk — and what we'd actually say.

"I'm handy. I want to build my own deck. But I don't want to mess up the framing — what's the right tier?"
Wade · Co-owner
Wade · Co-owner

That's textbook Assisted DIY. The framing is the part where mistakes don't show until year five and then they show big — and it's the part most handy homeowners are nervous about for good reason. We do the piles and the frame, code-compliant, inspection-ready. You do the deck boards, railing, and lighting on your own weekends. Save about two-thirds on install. Get an instant estimate, or come walk a finished one in Saskatoon or Regina.

Get an instant estimate
"What about a patio? Same idea — TUDS does the base, I lay the pavers?"
Shane · Co-owner
Shane · Co-owner

Exactly that. The base prep on a patio — excavation, compacted gravel, screeded sand — is what determines whether your pavers heave in five years. That's the structural third. Once we hand it to you, paver-laying is methodical work you can absolutely do yourself: lay the pattern, sweep polymeric sand, tamp, done. Same shape on a fence — TUDS augurs and sets the posts; you hang the panels and the caps. ~2/3 savings, structural foundation by us. (Note: patios and fences are expanding 2026 — call to confirm your build window.)

Get an instant estimate
"What if I get to the boards and realize I'm in over my head — can I switch to Managed Install mid-project?"
Wade · Co-owner
Wade · Co-owner

You can. The frame's already built — that's the hard part — so we'd just bring our finishing crew in to take over the deck boards, railing, and lighting. We'll re-quote the finishing portion at our standard Managed Install labour rate, plus any unused materials get squared up. Most customers don't end up doing this, but knowing the option exists is part of why Assisted DIY works. The CAD plan and material list mean we can pick up exactly where you left off.

Read more — Managed Install
What TUDS does vs what you do · Tier-by-tier comparison

The split — structure by us, finish by you.

Top of table — the structure-vs-finish split (the centerpiece). For each category — decks, patios, fences — what TUDS builds, what you finish, and where the ~2/3 savings live. Bottom of table — the 3-tier comparison. Assisted DIY vs Managed Install vs DIY help vs hiring a designer + buying from a big-box store. Honest descriptions, not rankings.

Category TUDS does (the structure)You do (the finishing)You saveWhere the money lives
Decks (primary, fully active) Piles drilled + code-compliant frame builtDeck boards + railing + lighting + accessories~2/3 install costBoards + railing ≈ 2/3 of typical bill
Patios (expanding 2026) Excavation + base prep + screededLay pavers + edge restraints + polymeric sand~2/3 install costPaver-laying ≈ 2/3 of typical bill
Fences (expanding 2026) Augur post holes + set posts plumbHang panels + caps + gates + finishing~2/3 install costPanel install ≈ 2/3 of typical bill
Why ~2/3 savings (the math) Framing ≈ 1/3 of deck install (piles + frame)Decking ≈ 1/3 + railing ≈ 1/3 (the other 2/3)= ~2/3 keeps with youSame shape: patios + fences
Who designs (CAD plan) TUDS — permit-gradeTUDSYou — TUDS guidesDesigner hire (separate fee)
Who builds the materials list TUDS — to-the-boardTUDSTUDS — free for DIY helpYou translate plan → SKUs
Who pulls permits TUDS pulls or you (your call)TUDSYou — TUDS advisoryYou — alone
Who does structural work TUDS — piles/frame/base/postsTUDS — full buildYou — aloneYou — alone
Who does finishing work You — boards/railing/lightingTUDSYou — aloneYou — alone
Build-week phone support Yes — direct Escape ArtistBuilt into projectYes — same as AssistedNo — designer is gone
Material warranty navigation TUDS in your cornerTUDS in your cornerTUDS in your cornerOn your own
Workmanship warranty TUDS warrants the structural workLifetime — held by TUDSYour build, your workmanshipContractor's — varies
Code compliance on structure TUDS — guaranteedTUDS — guaranteedYours to verifyContractor — varies
Total cost (relative) Mid — structure onlyHighest — labour includedLowest — materials onlyMid — designer + retail markup
Time you invest Medium — finishing weekendsLow — sign-off + walk-throughHigh — full buildHigh — coordinate everything
Tell me about TUDS PRO (contractor program)
Project ballpark

What does Assisted DIY actually cost?

Materials cost is straightforward. Add the structural-work portion (~1/3 of typical install cost) on top. No labour markup on the finishing — that's yours. The savings on a typical 320 sq ft deck run $5,000–$7,000 vs a fully Managed Install on the same materials.

100 ft² 1,000 ft² 2,000 ft²
Area priced
320sq ft

Material price below assumes you're buying the materials at TUDS retail. Assisted DIY layers the structural-work portion on top (~1/3 of install). Managed Install layers full labour (~30–40% of install). DIY help is materials only — no labour fee. For a real itemized quote on your specific yard, get an instant estimate at estimator.tuds.ca.

Materials + full labour (~30–40%)
Managed Install
approximate · boards only
Materials only (drawings + advice free)
DIY help
approximate · boards only
What we'll spec

What goes on every Assisted DIY build plan.

The fasteners, finishes, and cleaners we'll name in your design package — the right product on day one beats wrong product mid-finish.

Clips de borde de camuflaje.Hidden fastener

Camo Edge Clips

What we'll spec on your Assisted DIY plan for grooved composite boards. The right fastener saves you from putting the wrong screw in a $9/lin-ft board.

$54.19 starting
Pintura para corte final AxxentBoard-end finish

Axxent End-Cut Paint

Seals the cut ends of composite boards so the lighter core doesn't show. Eight colour shades — match to your tier colour.

$24.99
TUDS SUDS Deck CleanerCleaner

TUDS SUDS Deck Cleaner

Our house-brand cleaner, formulated for composite + wood decks. Non-caustic, non-butyl, eco-friendly.

$29.99
Reference resources

What your build follows. The paperwork.

Vendor install spec sheets and warranty documents. Your Assisted DIY package references the exact spec your tier requires.

Video

Eva-Last Composite Decking Installation (General)

All tiers
Video

Eva-Last Decking Collection Overview

All tiers
Video

Eva-Last Apex PLUS — Stronger, More Beautiful Composite

Apex PLUS
FAQ

What handy homeowners ask before they sign.

Don't see yours? Call either store and one of our Escape Artists will help.

Two halves. TUDS does the structural work: on a deck, that's piles drilled and a code-compliant frame built. On a patio, that's excavation and base prep. On a fence, that's auguring post holes and setting posts plumb. Plus everything ahead of the build — quote, CAD plan, materials takeoff, permit help, materials delivered to site. You do the finishing work: deck boards, railing, lighting on a deck. Pavers on a patio. Panels and caps on a fence. We're on call by phone or walk-in throughout your finishing.

On a typical deck install, framing is roughly one-third of the cost, decking is roughly one-third, and railing is roughly one-third. Assisted DIY puts TUDS on the framing — the structural foundation a code-compliant deck depends on — and hands you the other two-thirds. That's where the ~2/3 savings number comes from. Same shape for patios (base prep ≈ 1/3, paver-laying ≈ 2/3) and fences (post-set ≈ 1/3, panel install ≈ 2/3). The structural third is where mistakes are expensive in year five. The finishing two-thirds is where DIY savings live. We split it where the math says split it.

Yes. The frame's already built — that's the structural part — so switching is straightforward. We'd bring our finishing crew in to take over the deck boards, railing, and lighting (or pavers, or panels). The change order quotes our standard Managed Install labour rate for the remaining work, and any unused materials get squared up. Most customers don't end up doing this, but knowing the option exists is part of why Assisted DIY works. The CAD plan means we can pick up exactly where you left off.

TUDS does the base. That's the structural third — excavation to the right depth, compacted gravel, screeded bedding sand. Done right, your pavers don't heave in year three. You lay the pavers — pattern, edge restraints, polymeric sand, final tamp. Paver-laying is methodical work that's well-suited to DIY once the base is right. Patios are an expanding 2026 service — call either yard to confirm your build window.

TUDS augurs the post holes and sets the posts in concrete, plumb, on the right spacing for your panel system. That's the structural part — a Prairie wind exposes any post-setting shortcuts fast. You hang the panels, set the post caps, install the gates and any finishing hardware. Panel install is straightforward once the posts are true. Fences are an expanding 2026 service — call to confirm.

Your call. TUDS will pull the permit for a small flat fee if you'd rather not deal with the paperwork. Or we'll hand you a permit pack — drawings, spec sheets, checklist tailored to your municipality (Saskatoon, Regina, Moose Jaw, Warman, etc.) — and you submit it yourself and pay the city's fee. Most prairie cities require a permit for any deck over 10 sq m (108 sq ft) or higher than 600mm (24") off grade. Either way, the CAD plan we generate is permit-grade and walks the inspector through without questions.

Yes — every vendor we carry (Eva-Last, Trex, Fiberon, Deckorators, Fortress, Vista) warrants the boards regardless of who installs, as long as the install follows their published spec. That's part of why the CAD plan and fastener spec matter — they ensure your finishing install meets vendor requirements so the warranty stays in force. The vendor owns the material warranty process; TUDS doesn't file claims on your behalf (that has to come from the homeowner) but we know what documentation each vendor will ask for and we'll help you navigate.

Decks: 2–4 days on-site once piles are drilled and the frame goes up. Patios: 1–3 days for excavation and base prep depending on size. Fences: a day or two for auguring and post-set, plus a 24–48 hour cure on the concrete before you can hang panels. Schedule-wise, we typically schedule the structural work 1–3 weeks after sign-off (peak season is busier). You'd typically start your finishing work the weekend after we hand off.

Honest ballpark, Apex PLUS materials: a full Managed Install runs roughly $19,000–$22,000 all-in (materials + labour). Assisted DIY on the same deck runs roughly $13,000–$15,000 (materials + TUDS structural framing — you finish for free). DIY help — same materials, no TUDS labour at all — runs roughly $9,000–$10,000. The Assisted DIY savings vs Managed are the ~2/3 of the install labour you keep by finishing yourself. For a real number on your specific yard, get an instant estimate — these are illustrative, not committed.

From TUDS

Assisted DIY building, Prairie-style.

We make a lot of content because customers keep asking the same questions about which structural work to outsource, how to finish a deck without messing up the warranty, and where the savings actually live. Here's where it lives.

Latest from TUDS · YouTube

Watch the latest from TUDS

Unboxings, install walkthroughs, brand comparisons. New video most weeks — the player above always shows our latest.

Subscribe on YouTube →
The TUDS Podcast

The Deckheads

Honest talk about real projects, real mistakes, and Prairie deck-building. Long-form, for homeowners and pros alike.

Follow along — daily builds, honest takes.
Why TUDS

The numbers no other deck supplier in the prairies can match.

Real Google reviews from real Saskatoon and Regina customers — Assisted DIY, Managed Install, and DIY help all in the mix.

2016
Canadian-owned since
2
Stores — Regina & Saskatoon
90+
Authorized brands
10,000+
Customers helped
4.9
TUDS Google rating
★★★★★
GGoogle

“We recently gave our 20 year old wood deck a makeover with the help of The Ultimate Deck Shop. Justin at the Regina location was incredibly helpful with each of my visits, answering my questions and explaining/showing me things clearly. To refinish the top of the deck, we used Cutek Wood Reviver followed by Cutek Ex...”

Nicole N.
Regina · Jul 2025
★★★★★
GGoogle

“We had a great experience with The Ultimate Deck Shop. The fence we purchased is great quality. The service was amazing. The price was the best around. We would highly recommend to anyone and will definitely refer family and friends.”

Denise A.
Regina · Nov 2025
★★★★★
GGoogle

“Amazing service (Sam was super helpful and patient). Beautiful options, all staff were friendly. Highly recommend.”

Nikki H.
Regina · Jul 2025
Come see it in person

Two yards. Both your starting line.

Sit with an Escape Artist, sketch your yard on a napkin, and walk out with an Assisted DIY plan in motion. We don't book consults — just walk in, or call ahead and we'll have a coffee waiting.

Store

Regina

141 4th Avenue East, Regina SK

Sit with an Escape Artist, sketch your yard, and walk out with an Assisted DIY plan in motion. We'll quote the structural piece and the materials in one number.

Mon–Fri 7am–5pm · Sat 9am–3pm

Store

Saskatoon

320 68th Street East, Saskatoon SK

The deck store handy Saskatoon homeowners come to first — Assisted DIY structural work, materials, permit help, and the phone you call mid-finish.

Mon–Fri 7am–5pm · Sat 9am–3pm

Assisted DIY service area
SaskatoonReginaMoose JawPrince AlbertYorktonLumsdenWarmanMartensvilleSwift CurrentNorth BattlefordWeyburnEstevanHumboldtMelvilleRosthernTisdaleCalgaryEdmontonWinnipeg+ Most of SK, AB, MB
Saskatchewan-wide for structural work + materials. Alberta and Manitoba supported via materials delivery; structural crew availability for AB/MB depends on project size — call to confirm.
TUDS Assisted DIY

We build the structure. You finish it.

Save about two-thirds on install. Keep a code-compliant foundation. The handy homeowner's path to a TUDS-grade deck, patio, or fence — without contractor markup and without inheriting a structural problem. Get an instant estimate, or come walk a finished build in Saskatoon or Regina.